Move the concrete screed.
Loren Santow
Close [x]Sunset Books

Step 8

Move the concrete screed.

Have the shoveler spread the concrete until it is even with, or slightly above, the top of the form boards.

Set a straight 2 by 4 on the form board and on the temporary screed guide and work with a helper to screed the concrete by dragging the 2 by 4 across the surface. It may help to move the board in a sawing motion as you pull it.

Where the concrete is low, sprinkle on small amounts of concrete with a shovel, and then screed again.

Next »Step 9
«
Wheel and pour concrete into forms
Previous Step 7
»
Remove the temporary screed guide.
Next Step 9
9 of 20Move the concrete screed.