laying out the concrete slab
Loren Santow
Close [x]Sunset Books

Step 1

Excavate and build the form.

Lay out the site, remove sod, and measure for correct depth. Build the form out of 2 by 4s as you would construct lumber edging. If the form will be permanent, use pressure-treated or other rot-resistant lumber.

Anchor the form boards with some stakes every few feet. Drive the stakes slightly below the top of the form boards. The boards should feel solid when you kick them outward.

Next »Step 2
»
framing the concrete slab
Next Step 2
2 of 20laying out the concrete slab






  • Loading comments...

Add new comment

The rules: Keep it clean, and stay on the subject or we might delete your comment. If you see inappropriate language, e-mail us. An asterisk * indicates a required field.

2000 characters maximum




Calendar

JavaScript must be enabled to use this Calendar module.



New on the Web